Industrial Engineering and Production Management Critical path moves along the activities having total float of Same value Negative value Positive value Zero value Same value Negative value Positive value Zero value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling in automobile industry is done by Trolley Belt conveyor Overhead crane All of these Trolley Belt conveyor Overhead crane All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.95 0.66 0.84 0.5 0.95 0.66 0.84 0.5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Time study is used to Determine the number of machines a person may run Provide a basis for setting piece price or incentive wages All of the these Determine standard costs Determine the number of machines a person may run Provide a basis for setting piece price or incentive wages All of the these Determine standard costs ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar chart is suitable for Minor work Major work Large project All of these Minor work Major work Large project All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The simplex method is the basic method for Value analysis Operation research Linear programming Model analysis Value analysis Operation research Linear programming Model analysis ANSWER DOWNLOAD EXAMIANS APP