Industrial Engineering and Production Management The unit cost in case of batch production is __________as compared to jobbing production. None of these High Same Low None of these High Same Low ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as Dry work Plan Rowan Plan Halsey Premium Plan Taylor Plan Dry work Plan Rowan Plan Halsey Premium Plan Taylor Plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bin card is used in Foundry shop Workshop Stores Administrative wing Foundry shop Workshop Stores Administrative wing ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Military organisation is known as All of these Line organisation Line and staff organisation Functional organisation All of these Line organisation Line and staff organisation Functional organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In A-B-C analysis, which class of items are generally large in number? C None of these A B C None of these A B ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to (Normal time) + (allowances) (Normal time) - (allowances) Representative time multiplied by rating factor Normal time taken by an operation (Normal time) + (allowances) (Normal time) - (allowances) Representative time multiplied by rating factor Normal time taken by an operation ANSWER DOWNLOAD EXAMIANS APP