Power Systems Bonding is done at the both ends of the cable to reduce the iron loss None of these copper loss sheath loss iron loss None of these copper loss sheath loss ANSWER DOWNLOAD EXAMIANS APP
Power Systems The main objectives of power system is/are All of these Flexible power has to be available. Reliable power has to be available Cost of electrical energy per KWh is to be minimum All of these Flexible power has to be available. Reliable power has to be available Cost of electrical energy per KWh is to be minimum ANSWER DOWNLOAD EXAMIANS APP
Power Systems Capacitance voltage transformer ( CVT ) is used to connect instruments on the LT side. reduce losses in a transmission line. improve the power factor of the transmission. none of these. connect instruments on the LT side. reduce losses in a transmission line. improve the power factor of the transmission. none of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relays is/are unit protection relays? both 1 and 2 Buccholz relays Differential relays over current relays both 1 and 2 Buccholz relays Differential relays over current relays ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power planets is the least reliable Geothermal. Wind. Solar. Tidal. Geothermal. Wind. Solar. Tidal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The incremental fuel costs for two generating units G1 and G2 are given by Ic1 = 25 + 0.2 PG1 and Ic2 = 32 + 0.2 PG2, where PG1 and PG2 are real powers generated by the units. The economic allocation for a total load of 250 MW, neglecting transmission loss, is given by PG1 = 100 MW and PG2 = 150 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW PG1 = 100 MW and PG2 = 150 MW PG1 = 109.75 MW and PG2 = 140.25 MW PG1 = 142.5 MW and PG2 = 107.5 MW PG1 = 125 MW and PG2 = 125 MW ANSWER DOWNLOAD EXAMIANS APP