Power Systems Characteristics of arc quenching medium is/are All of these High thermal conductivity Non flammable High dielectric strength All of these High thermal conductivity Non flammable High dielectric strength ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 100 Km long transmission line is loaded at 110 kV. If the loss of line is 5 MW and the load is 150 VA the resistance of the line is 6.06 Ω / phase. 4.65 Ω / phase. 8.06 Ω / phase. 2.26 Ω / phase. 6.06 Ω / phase. 4.65 Ω / phase. 8.06 Ω / phase. 2.26 Ω / phase. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where is the draft tube of a hydroelectric plant that is an airtight pipe located At the beginning of the penstock. Near the surge tank. In between the runner exhaust and the tail race. In between the penstock and runner. At the beginning of the penstock. Near the surge tank. In between the runner exhaust and the tail race. In between the penstock and runner. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Thermal shielding is provided to prevent the reactor wall from getting heated. absorb the fast neutron. protected the operating personal from exposure to radiations. All of these prevent the reactor wall from getting heated. absorb the fast neutron. protected the operating personal from exposure to radiations. All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line has its conductors at the corners of an equilateral triangle with side 3m. The diameter of each conductor is 1.63 cm. The inductance of the line per phase per km is 1.182 mH 1.043 mH 1.093 mH 1.232 mH 1.182 mH 1.043 mH 1.093 mH 1.232 mH ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? Impulse tests. All of these. Load cycle tests. Thermal stability test. Impulse tests. All of these. Load cycle tests. Thermal stability test. ANSWER DOWNLOAD EXAMIANS APP