Railway Engineering At points and crossings, the total number of sleepers for 1 in 12 turnouts in Broad Gauge is 72 73 70 71 72 73 70 71 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The width of foot for 90 R rail section is 100 mm 122.2 mm 146.0 mm 136.5 mm 100 mm 122.2 mm 146.0 mm 136.5 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number offish bolts per fish plate is 5 2 6 4 5 2 6 4 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A train is hauled by 2-8-2 locomotive with 22.5 tonnes and on each driving axle. Assuming the coefficient of rail-wheel friction to be 0.25, what would be the hauling capacity of the locomotive? 45.0 tonnes 15.0 tonnes 22.5 tonnes 90.0 tonnes 45.0 tonnes 15.0 tonnes 22.5 tonnes 90.0 tonnes ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 0.168 cm 7.768 cm -0.168 cm 7.432 cm 0.168 cm 7.768 cm -0.168 cm 7.432 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 3,1,4,2 1,3,4,2 3,1,2,4 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP