Power Systems Which one of following fuels is used by slow thermal nuclear reaction for power generation U238. U235. Th232. Pu239. U238. U235. Th232. Pu239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Condenser. Wind turbine. Pulverising unit. Cooling tower. Condenser. Wind turbine. Pulverising unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a pressurized water reactor both B and C. water is used at high pressure so that it is available is liquid from at about 280° C. heavy water is used as both coolant and moderator. the coolant water boils in the reactor core. both B and C. water is used at high pressure so that it is available is liquid from at about 280° C. heavy water is used as both coolant and moderator. the coolant water boils in the reactor core. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. turbine efficiency. efficiency of thermal cycle. generator efficiency. product of efficiencies of all stages. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For accurate load flow calculations on large power systems, the best method is Decoupled method N-R method All of these G-S method Decoupled method N-R method All of these G-S method ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching vacuum. oil. SF6. air blast. vacuum. oil. SF6. air blast. ANSWER DOWNLOAD EXAMIANS APP