Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Cooling tower. Pulverising unit. Wind turbine. Condenser. Cooling tower. Pulverising unit. Wind turbine. Condenser. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is used for changing power factor from leading to lagging any of the above shunt reactor shunt capacitor series capacitor any of the above shunt reactor shunt capacitor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the disadvantages of phase modifiers? Initial cost of synchronous phase modifier is higher All of these It requires more maintenance because of running equipment It consumes both active and reactive power Initial cost of synchronous phase modifier is higher All of these It requires more maintenance because of running equipment It consumes both active and reactive power ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the stator faults? over current Inter phase faults All of these failure of excitation over current Inter phase faults All of these failure of excitation ANSWER DOWNLOAD EXAMIANS APP
Power Systems Telecommunication lines are transposed to reduce the efficiency radio interference in communication lines All of these voltage level efficiency radio interference in communication lines All of these voltage level ANSWER DOWNLOAD EXAMIANS APP
Power Systems A CT is connected in ___________________ with the line. both A and B. across. not connected. series. both A and B. across. not connected. series. ANSWER DOWNLOAD EXAMIANS APP