Power Systems Which of the following power plants can generate power at unpredictable or uncontrollable time Condenser. Pulverising unit. Wind turbine. Cooling tower. Condenser. Pulverising unit. Wind turbine. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pumped storage plant is a both 1 and 2 peak load plant base load plant None of these both 1 and 2 peak load plant base load plant None of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Ideal plant load cfactor is less than 1 greater than 1 1 0 less than 1 greater than 1 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging reactance of 50 km transmission line is 1500 Ω. What is the charging reactance for 100 km length of line? 750 Ω 1500 Ω 1000 Ω 3000 Ω 750 Ω 1500 Ω 1000 Ω 3000 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems A three phase, 33 kV oil circuit breaker is rated 1200 A, 2000 MVA, 3 secs. The symmetrical breaking current is 45 kA. 55 kA. 50 kA. 35 kA. 45 kA. 55 kA. 50 kA. 35 kA. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The use of high speed circuit breakers increased the short circuit current. decrease system stability. improves system stability. reduces the short circuit current. increased the short circuit current. decrease system stability. improves system stability. reduces the short circuit current. ANSWER DOWNLOAD EXAMIANS APP