Power Systems The use of high speed circuit breakers improves system stability. increased the short circuit current. reduces the short circuit current. decrease system stability. improves system stability. increased the short circuit current. reduces the short circuit current. decrease system stability. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The function of draft tube is reaction turbine is to convert kinetic energy of water. all of above. increase flow rate of water. reduce water hammer. convert kinetic energy of water. all of above. increase flow rate of water. reduce water hammer. ANSWER DOWNLOAD EXAMIANS APP
Power Systems An unloaded generator with a pre-fault voltage 1 pu has the following sequence impedance: Z0 = j 0.15 pu, Z1 = Z2 = j 0.25 pu The neutral is grounded with a reactance of 0.05 pu. The fault current in pu for single line to ground fault is 2.5 pu 7.25 pu 3.75 pu 4.28 pu 2.5 pu 7.25 pu 3.75 pu 4.28 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following statement are false In a nuclear reactor, multiplication factor is kept almost equal to one. Nuclear power plants are used as peak load plants only. In nuclear power plants, chain reaction is controlled by cadmium rods. A thermal reactor needs a moderator material. In a nuclear reactor, multiplication factor is kept almost equal to one. Nuclear power plants are used as peak load plants only. In nuclear power plants, chain reaction is controlled by cadmium rods. A thermal reactor needs a moderator material. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If, for a given alternator in economic operation mode, the incremental cost is given by (0.012 P + 8) Rs/MWh, dPL/dP = 0.2 and plant λ = 25, then power generation is 750 MW 1500 MW 1250 MW 1000 MW 750 MW 1500 MW 1250 MW 1000 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Thermal. Nuclear. Gas turbine. Hydro Power Plant Thermal. Nuclear. Gas turbine. ANSWER DOWNLOAD EXAMIANS APP