Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A string insulator has 4 units. The voltage across the bottom most unit is 33.33% of total voltage. Its string efficiency is 25% 66.66% 75% 33.33% 25% 66.66% 75% 33.33% ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power stations is mainly used to cover peak load on the system? nuclear plant coal based thermal power plant pumped storage hydro power plant gas based thermal power plant nuclear plant coal based thermal power plant pumped storage hydro power plant gas based thermal power plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The line currents of 3-phase supply are: IR = 3 + j 5 A IY =2 + j 2 A IB = -2 - j 1 A The zero sequence current will be 5 + j 7 A -2 - j 1 A 1 + j 4 A 1 + j 2 A 5 + j 7 A -2 - j 1 A 1 + j 4 A 1 + j 2 A ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Hydro-graph. Hectograph. Load duration curve. Monograph. Hydro-graph. Hectograph. Load duration curve. Monograph. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is larger zero less any of the above larger zero less any of the above ANSWER DOWNLOAD EXAMIANS APP