Power Systems Which of following power plants will take long period in erection and installation Thermal. Nuclear. Gas turbine. Hydro Power Plant Thermal. Nuclear. Gas turbine. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands in a ACSR conductor are 7, then find the layer number? 5 3 7 2 5 3 7 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The receiving end voltage for a long line under no load condition is any of the above more than the sending end voltage equal to the sending end voltage less than the sending end voltage any of the above more than the sending end voltage equal to the sending end voltage less than the sending end voltage ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power station needs space less than that required by the diesel power station of same output. less than that required by atomic power station of the same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. less than that required by the diesel power station of same output. less than that required by atomic power station of the same output. less than that required by hydro-power station of same capacity. less than that required by a gas turbine power plant of same output. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Advantages of higher transmission voltage is/are Power transfer capability of the transmission line is increased Area of cross section and volume of the conductor is reduced Transmission line losses are reduced All of these Power transfer capability of the transmission line is increased Area of cross section and volume of the conductor is reduced Transmission line losses are reduced All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Highest pressure generating pump inside the thermal plant is high pressure heater low pressure heater All of these boiler feed pump high pressure heater low pressure heater All of these boiler feed pump ANSWER DOWNLOAD EXAMIANS APP