Power Systems Which of following power plants will take long period in erection and installation Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant ANSWER DOWNLOAD EXAMIANS APP
Power Systems The equation of area control error(ACE) is ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie + b.Δf ACE = ΔPtie +1/ b.Δf ACE = ΔPtie - b.Δf ACE = ΔPtie - 1/b.Δf ACE = ΔPtie + b.Δf ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following represents the transmission line positive sequence reactance Xs - Xm 2Xs + Xm Xm - Xs Xs +2 Xm Xs - Xm 2Xs + Xm Xm - Xs Xs +2 Xm ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a 3-phase transmission line, each phase is supported by 3 insulated discs, maximum voltage of each disc is 20 kV. Find the operating voltage of the transmission line per phase if efficiency of string is 80.6%. 20 kV 83.76 kV 52.84 kV 48.36 kV 20 kV 83.76 kV 52.84 kV 48.36 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems The total number of strands in a ACSR conductor are 7, then find the layer number? 3 2 5 7 3 2 5 7 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MVA alternator operated at no load at frequency of 50 Hz, it has inertia constant of 5 MWsec/MVA and governing system has a time delay of 0.6 sec. If the load of 50 MW is suddenly applied then find the frequency deviation during this time? -0.76 Hz 0.76 Hz 0.85 Hz -0.85 Hz -0.76 Hz 0.76 Hz 0.85 Hz -0.85 Hz ANSWER DOWNLOAD EXAMIANS APP