Power Systems A loss less transmission line having surge impedance loading (SIL) of 2280 MW is provided with a uniformly distributed series capacitive compensation of 30 %. Then SIL of compensated transmission line will be 1835 MW. 2280 MW. 3257 MW. 2725 MW. 1835 MW. 2280 MW. 3257 MW. 2725 MW. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15 MW. The plant capacity is 20 MW. Find the reserve capacity of the plant? 15 MW 10 MW 20 MW 5 MW 15 MW 10 MW 20 MW 5 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the fault is very nearer to the generator, the fault current is any of the above larger less zero any of the above larger less zero ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following generating plants has the minimum operating cost Steam plant. Hydroelectric plant. Diesel plant. Nuclear plant. Steam plant. Hydroelectric plant. Diesel plant. Nuclear plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Isolator in sub station is open under ------------- condition? any of the above no load short circuit full load any of the above no load short circuit full load ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following method is/are more reliable? Newton Raphson (NR) method Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method All of these Newton Raphson (NR) method Gauss-Siedel (GS) method Fast Decoupled Load Flow (FDLF) method All of these ANSWER DOWNLOAD EXAMIANS APP