Power Systems

Power Systems
If the inertia constant H = 8 MJ/MVA for a 50 MVA generator, the stored energy is

 8 MJ
 200 MJ
 50 MJ
 400 MJ

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Which of following power plants will take long period in erection and installation

 Thermal.
 Nuclear.
 Gas turbine.
 Hydro Power Plant

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
With reference to hydrometer station, the graphical representation of the discharge as function of time is known as

 Load duration curve.
  Hydro-graph.
 Monograph.
 Hectograph.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In which of the following given faults, all the sequence currents are equal?

 LLG
 LG
 LL
 LLL

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The receiving end voltage for a long line under no load condition is

 less than the sending end voltage
 any of the above
 more than the sending end voltage
 equal to the sending end voltage

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A transmission line has (2 + j4)Ω impedance, 100 MVA and base voltage is 10 KV. Find the per unit impedance value of transmission line?

 (4 + j8 ) pu
 (1 + j2 ) pu
 (2 + j4 ) pu
 (0.5 + j1 ) pu

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑