Surveying Which of the following methods of offsets involves less measurement on the ground? method of ties method of oblique offsets method of perpendicular offsets all involve equal measurement on the ground method of ties method of oblique offsets method of perpendicular offsets all involve equal measurement on the ground ANSWER DOWNLOAD EXAMIANS APP
Surveying During chaining along a straight line, the . leader of the party has 4 arrows in his hand while the follower has 6. Distance of the follower from the starting point is 6 chains 180m 4 chains 120 m 6 chains 180m 4 chains 120 m ANSWER DOWNLOAD EXAMIANS APP
Surveying If θ and δ be the latitude of a place and declination of a star respectively, the upper culmination of the star will be north of zenith if its zenith distance, is θ - δ θ + δ (θ + δ)/2 δ - θ θ - δ θ + δ (θ + δ)/2 δ - θ ANSWER DOWNLOAD EXAMIANS APP
Surveying With standard meridian as 82° 30' E the standard time at longitude 90° E is 8 h 30 m. The local mean time at the place will be 8 h 00 m 7 h 00 m 9 h 00 m 7 h 30 m 8 h 00 m 7 h 00 m 9 h 00 m 7 h 30 m ANSWER DOWNLOAD EXAMIANS APP
Surveying Triangulation surveys are carried out for providing Planimetric control Height control Both planimetric and height control None of these Planimetric control Height control Both planimetric and height control None of these ANSWER DOWNLOAD EXAMIANS APP
Surveying The latitude of a place was obtained by subtracting the zenith distance of a star from its declination, the observed star was between Equator and zenith Horizon and equator Pole and horizon Zenith and pole Equator and zenith Horizon and equator Pole and horizon Zenith and pole ANSWER DOWNLOAD EXAMIANS APP