Power Systems Which of the following is/are the disadvantages of phase modifiers? Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment It consumes both active and reactive power All of these Initial cost of synchronous phase modifier is higher It requires more maintenance because of running equipment It consumes both active and reactive power All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems What will be the thermal efficiency of a 240 V, 1000 W electric kettle if it brings 2 liters of water at 15° C to boiling point 15 Minutes 79.33 %. 78.96 %. 74.56 %. 80.25 %. 79.33 %. 78.96 %. 74.56 %. 80.25 %. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The 1st nuclear plant in world was commissioned in UAE. U.K. U.S.S.R. U.S.A. UAE. U.K. U.S.S.R. U.S.A. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the time of operation of a relay for unity TMS is 10 sec. the time of operation of 0.5 TMS will be _______________ secs. 7. 3. 5. 20. 7. 3. 5. 20. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Two generating stations delivering a powers of P1 = 150 MW, P2 =100 MW and the B coefficients are B11 = 0.005, B22 = 0.002, B12=B21= -0.001. Find the transmission line losses? 85.5 102.5 95.5 105.2 85.5 102.5 95.5 105.2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is not a secondary nuclear fuel U233. Pu239. None of above. U235. U233. Pu239. None of above. U235. ANSWER DOWNLOAD EXAMIANS APP