GETCO Exam Paper (22-07-2015) Which of the following is the most likely reason for large overshoot in a control system? high positive correcting torque High gain in a system high retarding torque presence of dead time delay high positive correcting torque High gain in a system high retarding torque presence of dead time delay ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Switching surges are power frequency voltage short duration transient voltage high voltage Acs high votage DCs power frequency voltage short duration transient voltage high voltage Acs high votage DCs ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Kathakali' is a folk dance prevalent in which state? Andhra Pradesh Orissa Kerala Karnataka Andhra Pradesh Orissa Kerala Karnataka ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) HVDC transmission is preferred to EHV AC because System stability can be improved Its terminal equipment are inexpensive Harmonic problem is avoided VAR compensation is not required in it System stability can be improved Its terminal equipment are inexpensive Harmonic problem is avoided VAR compensation is not required in it ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The surge impedance loading of the line will _____ if the length of the line is double four times remains same double become half four times remains same double become half ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Surge impedance is independent of length of the line
GETCO Exam Paper (22-07-2015) "Overshoot" in a time response of control systems is indication of measure of relative stability none of this steady state solution final value of the output measure of relative stability none of this steady state solution final value of the output ANSWER DOWNLOAD EXAMIANS APP