GETCO Exam Paper (22-07-2015)

GETCO Exam Paper (22-07-2015)
The fault occurring in transmission actually are mostly

L-L
L-L-G
L-L-L
L-G

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
Which power plant may take several days to start up and shunt down?

solar power plant
none of these
Base load
Peak load

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The recent (as on 22/07/2015) Mahakumbh is held at

Alahabad
Nasik
Ujjain
Haridwar

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
The breaking capacity of a CB is usually expressed interms of

MW
volts
amperes
MVA

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
In a given current transformer, If permissible current ratio error rated primary current is 5% the CT is suitable for

both measuring and protection
measuring purpose
protection purpose
as power transformer

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (22-07-2015)
For a given transformer volte/turn for primary and secondary winding is

same
depends on load
depends on transformer design
different

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

emf = 4.44*f*φ*T
emf/T = 4.44*f*φ

MORE MCQ ON GETCO Exam Paper (22-07-2015)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑