Power Systems Which of following are the fertile materials U238 and Pu239. U238 and Th232. U233 and Pu239. U238 and Th239. U238 and Pu239. U238 and Th232. U233 and Pu239. U238 and Th239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The method of neutral grounding affects the zero sequence network positive sequence network negative sequence network All of these zero sequence network positive sequence network negative sequence network All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems Per unit of any quantity is defined as actual value of quantity /base value of quantity in different units base value of quantity /actual value of quantity in same units base value of quantity /actual value of quantity in different units actual value of quantity /base value of quantity in same units actual value of quantity /base value of quantity in different units base value of quantity /actual value of quantity in same units base value of quantity /actual value of quantity in different units actual value of quantity /base value of quantity in same units ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generating station which has a high investment cost and low operating cost is usually operated as a Peak load station. Base load station. Minimum load station. None of above. Peak load station. Base load station. Minimum load station. None of above. ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the methods of laying underground cables? Direct laying. Both A and B. None of these. Draw - in - system / duct - pipe laying. Direct laying. Both A and B. None of these. Draw - in - system / duct - pipe laying. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of diversity factor is greater than 1 less than 1 0 1 greater than 1 less than 1 0 1 ANSWER DOWNLOAD EXAMIANS APP