Irrigation Engineering When surface of transpiration is submerged under water, then potential evapotranspiration is equal to evapotranspiration much less than evapotranspiration much more than evapotranspiration equal to or less than evapotranspi-ration equal to evapotranspiration much less than evapotranspiration much more than evapotranspiration equal to or less than evapotranspi-ration ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A water-logged land is found suitable for cultivation due to Regular supply of water to plants from the water table by capillary action Absence of aeration of soil from root zone of the plant None of these Ease of tillage for preparation of the field for optimum condition of germination Regular supply of water to plants from the water table by capillary action Absence of aeration of soil from root zone of the plant None of these Ease of tillage for preparation of the field for optimum condition of germination ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A divide wall is provided At an inclination to the axis of weir Parallel to the axis of weir and upstream of it At right angle to the axis of weir Parallel to the axis of weir and downstream of it At an inclination to the axis of weir Parallel to the axis of weir and upstream of it At right angle to the axis of weir Parallel to the axis of weir and downstream of it ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A unit hydro graph has one unit of discharge rainfall duration rainfall excess time base of direct runoff discharge rainfall duration rainfall excess time base of direct runoff ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering While deciding the alignment of a proposed canal taking off from a river at B, three alignments of approximately equal lengths are available. These cross a drainages at C1, C2 and C3 where drainage bed levels C1 > C2 > C3, you will provide at site C3 An aqueduct A syphon A super passage A syphon aqueduct An aqueduct A syphon A super passage A syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For designing the venturi head, Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm All listed here Width of the throat should not be less than one-third of the bed width of main canal Length of the throat should be 2.5 times the depth measured to F.S.L. in the main canal Minimum throat width should not be less than 60 cm All listed here Width of the throat should not be less than one-third of the bed width of main canal ANSWER DOWNLOAD EXAMIANS APP