Irrigation Engineering A unit hydro graph has one unit of rainfall duration time base of direct runoff discharge rainfall excess rainfall duration time base of direct runoff discharge rainfall excess ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To determine the discharge at a section in a stream from its rating curve, the required data arei) slope of water surface at the sectionii) stage at the sectioniii) current meter readings at the sectionThe correct answer is (ii) and (iii) only (ii) only (iii) (i) and (ii) (ii) and (iii) only (ii) only (iii) (i) and (ii) ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Horizontal acceleration due to earthquake results in both (A) and (B) inertia force into the body of the dam hydrodynamic pressure None of these both (A) and (B) inertia force into the body of the dam hydrodynamic pressure None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For standing crops in undulating sandy fields, the best method of irrigation, is Free flooding Sprinkler irrigation Check method Furrow method Free flooding Sprinkler irrigation Check method Furrow method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The crest level of a canal diversion head work, depends upon Discharge perimeters Pond level F.S.L. of the canal All listed here Discharge perimeters Pond level F.S.L. of the canal All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Study the following statements.i) Levees are constructed parallel to river flow,ii) Spurs are constructed parallel to river flow,iii) Levees are constructed transverse to river flow,iv) Spurs are constructed transverse to river flow.The correct answer is (iii) and (iv) (ii) and (iii) (i) and (ii) (i) and (iv) (iii) and (iv) (ii) and (iii) (i) and (ii) (i) and (iv) ANSWER DOWNLOAD EXAMIANS APP