Irrigation Engineering A unit hydro graph has one unit of discharge time base of direct runoff rainfall duration rainfall excess discharge time base of direct runoff rainfall duration rainfall excess ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ? slope-area method moving boat method ultra-sonic method area-velocity method slope-area method moving boat method ultra-sonic method area-velocity method ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In Montague type fall No glacis is provided A circular glacis is provided A straight glacis is provided A parabolic glacis is provided No glacis is provided A circular glacis is provided A straight glacis is provided A parabolic glacis is provided ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called Syphon Syphon aqueduct Super passage Super-aqueduct Syphon Syphon aqueduct Super passage Super-aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Assertion A : To estimate the rainfall over a catchment, the number of raingauges required per unit area is large for hilly areas.Reason R : Rainfall gradient is steep.Select your correct answer according to the coding system given below : Both A and R are true but R is not the correct explanation of A Both A and R are true and R is the correct explanation of A A is true but R is false A is false but R is true Both A and R are true but R is not the correct explanation of A Both A and R are true and R is the correct explanation of A A is true but R is false A is false but R is true ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The minimum size of stone that will remain at rest in a channel of longitudinal slope S and hydraulic mean depth R is given by 11RS 4RS 7RS 15 RS 11RS 4RS 7RS 15 RS ANSWER DOWNLOAD EXAMIANS APP