Railway Engineering When semaphore and warner are installed on the same post, then the stop indication is given when both semaphore and warner arms lowered both arms are horizontal None of these semaphore arm lowered but warner arm horizontal both semaphore and warner arms lowered both arms are horizontal None of these semaphore arm lowered but warner arm horizontal ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering On a single rail track, goods trains loaded with heavy iron material run starting from ‘A’ to ‘B’ and then empty wagons run from ‘B’ to ‘A’. The amount of creep in the rails: Will be maximum at the middle of A and B Will be more in the direction of A to B Cannot be determined from the given data Will be more in the direction of B to A Will be maximum at the middle of A and B Will be more in the direction of A to B Cannot be determined from the given data Will be more in the direction of B to A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The rail is designated by its length weight weight per unit length cross-section length weight weight per unit length cross-section ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Anti creep bearing plates are provided on joints both (A) and (B) None of these bridges and approaches joints both (A) and (B) None of these bridges and approaches ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering If ‘A’ is the angle formed by two gauge faces, the crossing number will be cot A sec A Arad tan A cot A sec A Arad tan A ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Consider the following surveys.1. Reconnaissance survey2. Preliminary survey3. Traffic survey4. Location surveyThe correct sequence in which these surveys are conducted before the alignment of a track is finalised is 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 1,3,4,2 3,1,2,4 3,1,4,2 1,3,2,4 ANSWER DOWNLOAD EXAMIANS APP