Power Systems
When a pumped storage power plant is operated in conjunction with a steam power plant

All of these
 load factor of the steam plant is increased
 the operating cost of the steam plant become optimum
 chances of the tripping of the system decrease

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
A lossless power system has to serve a load of 250 MW. There are two generators(G1 and G2) in the system with cost curves C1 and C2 respectively defined as follows: C1 = PG1+0.055P²G1 C2 = 3 PG2 + 0.03 P²G2 Where PG1 and PG2 are the MW injections from generators G1 and G2 respectively. Thus, the minimum cost dispatch will be

 PG1 = 150 MW and PG2 = 100 MW
 PG1 = 100 MW and PG2 = 150 MW
 PG1 = 250 MW and PG2 = 0 MW
 PG1 = 0 MW and PG2 = 250 MW

ANSWER DOWNLOAD EXAMIANS APP