What is the largest thermal power plant in India?

Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station
Mundra Thermal Power Station
Sasan Ultra Mega Power Plant

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Which among the following are included in the two part tariff?
i. Fixed charges
ii. Running charges
iii. Semi fixed charges

(i), (ii) and (iii)
(i) and (iii) only
(ii) and (iii) only
(i) and (ii) only

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Case 1: The PV connected to the DC bus was injecting 20 kW of power constituting of 1 kW of loss
Case 2: The same PV is connected to the AC bus constituting to 1.5 kW loss. Find out the change in efficiency from Case 1 to Case 2?

2.5% increase
2.5% decrease
5% decrease
5% increase