MGVCL Exam Paper (30-07-2021 Shift 1)
In underground cables, the electrostatic stress is ___ at contactor surface and ___ at the sheath.

zero, zero
minimum, maximum
zero, minimum
minimum, maximum

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
Murray loop test is performed on a faulty cable 300 m long. At balance, the resistance connected to the faulty core was set at 15 Ω and the resistance of the resistor connected to the sound core was 45 Ω. Calculate the distance of the fault point from the test end.

450 m
225 m
150 m
75 m

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 1)
What is the largest thermal power plant in India?

Mundra Thermal Power Station
Sasan Ultra Mega Power Plant
Vindhyachal Thermal Power Station
Talcher Super Thermal Power Station

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP