Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of Girders Slabs All of these Beams Girders Slabs All of these Beams ANSWER DOWNLOAD EXAMIANS APP
Building Construction As compared to stretcher course, the thickness of joints in header course should be More Less Equal Equal or more More Less Equal Equal or more ANSWER DOWNLOAD EXAMIANS APP
Building Construction In soils possessing low bearing capacity, the type of foundation generally provided, is Column footing All of these Raft footing Grillage footing Column footing All of these Raft footing Grillage footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction In grillage foundations a minimum 15 cm cover is provided on Lower beam of lower tier Upper flange of top tier None to these Ends of external beams Lower beam of lower tier Upper flange of top tier None to these Ends of external beams ANSWER DOWNLOAD EXAMIANS APP
Building Construction A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to 10 % 25 % 15 % 20 % 10 % 25 % 15 % 20 % ANSWER DOWNLOAD EXAMIANS APP
Building Construction The art of bringing the floor to a true level surface by means of screeds, is called None of these Topping Screeding Bedding None of these Topping Screeding Bedding ANSWER DOWNLOAD EXAMIANS APP