Building Construction
In clay soil

Differential settlement is generally prevalent
Consolidation continues even after several years of construction
All listed here
Swelling and shrinkage characteristics prevail

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Rotary drilling

Is not suitable for deposits containing very coarse gravel
Is not economical for holes of less than 10 cm
All listed here
Hinders the ground water observations and permeability test

ANSWER DOWNLOAD EXAMIANS APP