Power Systems To improve the efficiency of thermal power plant ________________ is placed between boiler and turbine. superheater. ash handling point. economizer. air preheater. superheater. ash handling point. economizer. air preheater. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In a power system with negligible resistance, the fault current at a point is 8.00 pu. The series reactance is to be included at the fault point to limit the short circuit. current to 5.00 pu is 3.000 pu. 0.200 pu. 0.075 pu. 0.125 pu. 3.000 pu. 0.200 pu. 0.075 pu. 0.125 pu. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠°90 Ω, C = 0.5*10^-6∠90° â„§. Find Charging current under no load? 1.144∠90° A/phase 0.512∠90° A/phase 0.344∠90° A/phase 0.144∠90° A/phase 1.144∠90° A/phase 0.512∠90° A/phase 0.344∠90° A/phase 0.144∠90° A/phase ANSWER DOWNLOAD EXAMIANS APP
Power Systems For n bus power system size of Y bus matrix is (n-1)×(n-1) n×n (n-1)×(n-2) (n-2)×(n-2) (n-1)×(n-1) n×n (n-1)×(n-2) (n-2)×(n-2) ANSWER DOWNLOAD EXAMIANS APP
Power Systems Mho relay is used for the protection of long transmission lines. short length lines. medium length lines. no length criterion. long transmission lines. short length lines. medium length lines. no length criterion. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Maximum power transfer in a transmission line can be obtained by either 1 or 2 None of these increasing voltage level reducing reactance either 1 or 2 None of these increasing voltage level reducing reactance ANSWER DOWNLOAD EXAMIANS APP