GETCO Exam Paper (22-07-2015) The Z matrix of 2 port network is given by [0.9 0.2 : 0.2 0.6]. The element Y22 of the corresponding Y matrix of the same network is given by 1.8 1.2 -0.4 0.4 1.8 1.2 -0.4 0.4 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which power plant may take several days to start up and shunt down? Peak load solar power plant none of these Base load Peak load solar power plant none of these Base load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Power Factor correcting element is generally connected in _____ series with load series with source parallel to source parallel to the load series with load series with source parallel to source parallel to the load ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In a DC motor, back EMF value becomes maximum at _____ 3/4 load 1/2 load full load no load 3/4 load 1/2 load full load no load ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Answer in official key is “1/2 load ”.
GETCO Exam Paper (22-07-2015) The power factor of the arc in circuit breaker is always lagging always unity always leading always zero always lagging always unity always leading always zero ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Root Locus is locus of the _____ open loop zeros to close poles close loop poles close loop poles to close loop zeros open loop poles to open loop zeros open loop zeros to close poles close loop poles close loop poles to close loop zeros open loop poles to open loop zeros ANSWER DOWNLOAD EXAMIANS APP