GETCO Exam Paper (22-07-2015) For given kVAR and line voltage the ratio of star to delta value of capacitor is 3 1 0.33333333333333 1.73 3 1 0.33333333333333 1.73 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Penalty factor in power system economical operation is measure of fuel cost generation cost all are correct Line loss fuel cost generation cost all are correct Line loss ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Which city is capital of Meghalaya? (As on 22/07/2015) Dispur Itanagar Shilong Imphal Dispur Itanagar Shilong Imphal ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) To find the most accurate values of resistance and inductance of the transmission line T configuration is used Distributed parameter configuration used Pi configuration is used End condenser configuration is used T configuration is used Distributed parameter configuration used Pi configuration is used End condenser configuration is used ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The rating of given on the name plate of a transformer indicates the: Apparent power which it draws from the supply mains True power which it can supply True power whichh it draws from the supply mains Apparent power which it can supply Apparent power which it draws from the supply mains True power which it can supply True power whichh it draws from the supply mains Apparent power which it can supply ANSWER EXPLANATION DOWNLOAD EXAMIANS APP The rating of given on the name plate of a transformer indicates the:Apparent power which it can supply S=V( supplied voltage)*I (load current)active power = v* i*cosφreactive power = v* i*sinφ
GETCO Exam Paper (22-07-2015) The line current in a three phase unbalanced load are Ir= 4+j6, Ib= 2-j2 and Ic= -3+j2, then zero sequence component of current will be 3 - j6 1 + j2 3 + j6 9 + j10 3 - j6 1 + j2 3 + j6 9 + j10 ANSWER DOWNLOAD EXAMIANS APP