Irrigation Engineering The uplift pressure on the face of a drainage gallery in a dam is taken as two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel average of hydrostatic pressure at toe and heel None of these hydrostatic pressure at toe two-third of hydrostatic pressure at toe plus one-third of hydrostatic pressure at heel average of hydrostatic pressure at toe and heel None of these hydrostatic pressure at toe ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which of the following methods of applying water may be used on rolling land ? free flooding check flooding furrow flooding boarder flooding free flooding check flooding furrow flooding boarder flooding ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Borrow pits should preferably be located in Fields on both sides of the canal Central half width of the section of the canal Field on the left side of the canal Field on the right side of the canal Fields on both sides of the canal Central half width of the section of the canal Field on the left side of the canal Field on the right side of the canal ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The peak of a 4 hour flood hydrograph is 240 m3/sec . If the rainfall excess is 80 mm and base flow which is constant is 40 m3/sec, then the peak of 4-hours unit hydrograph will be 30 m3/sec 25 m3/sec 20 m3/sec 35 m3/sec 30 m3/sec 25 m3/sec 20 m3/sec 35 m3/sec ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable material for the central impervious core of a zoned embankment type dam is clay coarse sand silty clay clay mixed with fine sand clay coarse sand silty clay clay mixed with fine sand ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually subcritical super critical uniform critical subcritical super critical uniform critical ANSWER DOWNLOAD EXAMIANS APP