Irrigation Engineering The ratio of the quantity of water stored in the root zone of the crops to the quantity of water actually delivered in the field is known as None of these water conveyance efficiency water use efficiency water application efficiency None of these water conveyance efficiency water use efficiency water application efficiency ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A divide wall is provided Parallel to the axis of weir and upstream of it At right angle to the axis of weir Parallel to the axis of weir and downstream of it At an inclination to the axis of weir Parallel to the axis of weir and upstream of it At right angle to the axis of weir Parallel to the axis of weir and downstream of it At an inclination to the axis of weir ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be superpassage aqueduct syphon syphon aqueduct superpassage aqueduct syphon syphon aqueduct ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is 100 PLC PLC/1000 PL/1000C PC/100L 100 PLC PLC/1000 PL/1000C PC/100L ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In a chute spillway, the flow is usually super critical subcritical critical uniform super critical subcritical critical uniform ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydroelectric scheme operating under a head of 80 m will be classified as None of these medium head scheme low head scheme high head scheme None of these medium head scheme low head scheme high head scheme ANSWER DOWNLOAD EXAMIANS APP