Irrigation Engineering In a barrage, the crest level is kept Low with no gates Low with large gates High with large gates High with no gates Low with no gates Low with large gates High with large gates High with no gates ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is PC/100L PL/1000C 100 PLC PLC/1000 PC/100L PL/1000C 100 PLC PLC/1000 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Lining of irrigation channels does not change the water logging area None of these increases the waterlogging area decreases the waterlogging area does not change the water logging area None of these increases the waterlogging area decreases the waterlogging area ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The ratio of rate of change of the discharge of an outlet to the rate of change of the discharge of distributing channel is called flexibility proportionality sensitivity setting flexibility proportionality sensitivity setting ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering As compared to crest of the normal portion of the weir, the crest of the under sluice portion of weir is kept at same level lower level higher level any of the above depending on the design same level lower level higher level any of the above depending on the design ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The top of the capillary zone None of these Coincides the water table at every point Lies above the water table at every point Lies below the water table at every point None of these Coincides the water table at every point Lies above the water table at every point Lies below the water table at every point ANSWER DOWNLOAD EXAMIANS APP