Building Construction The portion of a brick cut across the width, is called Bed Half brick Closer Bat Bed Half brick Closer Bat ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided on a sloping roof of a building, is called Dormer window Lantern window Louvered window Rash window Dormer window Lantern window Louvered window Rash window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The concrete slump recommended for foundations, is 30 to 125 mm 50 to 100 mm 25 to 50 mm 75 to 125 mm 30 to 125 mm 50 to 100 mm 25 to 50 mm 75 to 125 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In jack arch floor, the rise is kept 1/10th of the span 1/8th of the span 1/12th of the span 1/6th of the span 1/10th of the span 1/8th of the span 1/12th of the span 1/6th of the span ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bond in which headers and stretchers are laid in alternate courses and every stretcher course is started with a three fourth brick bat, is known as Monk bond Dutch bond Rat-trap bond English cross bond Monk bond Dutch bond Rat-trap bond English cross bond ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of two surfaces of a sloping roof forming an internal angle less than 180°, is known as Hip Valley None of these Ridge Hip Valley None of these Ridge ANSWER DOWNLOAD EXAMIANS APP