Building Construction The members which support covering material of a sloping roof, are Purlins Rafters Battens Struts Purlins Rafters Battens Struts ANSWER DOWNLOAD EXAMIANS APP
Building Construction Rotary drilling is the fastest method in case of All of these Sandy soil Rocky soils Clay soils All of these Sandy soil Rocky soils Clay soils ANSWER DOWNLOAD EXAMIANS APP
Building Construction Vertical construction joints are provided where the shearing forces are minimum in the case of All of these Beams Girders Slabs All of these Beams Girders Slabs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum depth of foundation in clayey soils is 0.9 m 0.7 m 0.5 m 1.2 m 0.9 m 0.7 m 0.5 m 1.2 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The piece of a brick cut with its one corner equivalent to half the length and half the width of a full brick, is known as King closer Half king closer Queen closer Bevelled closer King closer Half king closer Queen closer Bevelled closer ANSWER DOWNLOAD EXAMIANS APP
Building Construction The alignment of a cross joint along the plumb line is Lintel Vertical line Bed block Perpend Lintel Vertical line Bed block Perpend ANSWER DOWNLOAD EXAMIANS APP