Building Construction The process of working a flat for the finishing coat, is known Blistering Knitting Dubbing out Floating Blistering Knitting Dubbing out Floating ANSWER DOWNLOAD EXAMIANS APP
Building Construction If a is the offset of concrete bed in cms, and d is the depth of concrete bed in cms, then d = 0.557 a None of these d = 0.445 a d = 0.775 a d = 0.557 a None of these d = 0.445 a d = 0.775 a ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on sandy soil, maximum permissible differential settlement, is usually limited to 25 mm 35 mm 15 mm 45 mm 25 mm 35 mm 15 mm 45 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The radial splits which are wider on the outside of the log and narrower towards the pith are known as Starshakes Rindgalls Heart shakes Cupshakes Starshakes Rindgalls Heart shakes Cupshakes ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level Between ceiling and floor level Upto roof above ground level Between ceiling and ground level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction For providing a raft foundation, the following activities are involved1.Ramming the foundation bed2.Excavation of the soil upto required depth3.Laying the reinforcement over the foundation bed4.Curing the cement concrete placed over reinforcement5.Pouring the cement concrete over the reinforcementThe correct sequence is 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 1, 2, 3, 4, 5 5, 4, 3, 2, 1 3, 2, 5, 1, 4 2, 1, 3, 5, 4 ANSWER DOWNLOAD EXAMIANS APP