Irrigation Engineering The meander pattern of a river is developed by Dominant discharge Average discharge Maximum discharge Critical discharge Dominant discharge Average discharge Maximum discharge Critical discharge ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The main function of a diversion head works of a canal from a river, is To raise water level To store water To control floods To remove silt To raise water level To store water To control floods To remove silt ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If there are two canals taking off from each flank of a river, then there will be two divide walls and one undersluice one divide wall and two undersluices two divide walls and two undersluices one divide wall and one undersluice two divide walls and one undersluice one divide wall and two undersluices two divide walls and two undersluices one divide wall and one undersluice ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Wetted perimeter of a regime channel for a discharge of 64 cumecs as per Lacey’s theory will be 15m 91m 38m 19m 15m 91m 38m 19m ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A water-logged land is found suitable for cultivation due to Absence of aeration of soil from root zone of the plant Regular supply of water to plants from the water table by capillary action Ease of tillage for preparation of the field for optimum condition of germination None of these Absence of aeration of soil from root zone of the plant Regular supply of water to plants from the water table by capillary action Ease of tillage for preparation of the field for optimum condition of germination None of these ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Irrigation canals are generally aligned along Valley line Ridge line Straight line Contour line Valley line Ridge line Straight line Contour line ANSWER DOWNLOAD EXAMIANS APP