Irrigation Engineering The main function of a diversion head works of a canal from a river, is To store water To remove silt To raise water level To control floods To store water To remove silt To raise water level To control floods ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A 6 hours storm had 4 cm of rainfall and the resulting runoff was 2 cm. If<="" div=""> 7.5 cm 9.0 cm 6.0 cm 4.5 cm 7.5 cm 9.0 cm 6.0 cm 4.5 cm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If it rains between 2 P.M. and 3 P.M. and the entire basin area just starts contributing water at 3 P.M. to the outlet, then time of concentration will be 60 minutes 20 minutes 15 minutes 30 minutes 60 minutes 20 minutes 15 minutes 30 minutes ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Useful soil moisture for plant growth, is Gravity water Hygroscopic water Capillary water Chemical water Gravity water Hygroscopic water Capillary water Chemical water ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A raingauge should preferably be fixed near the building under the tree in a closed space in an open space near the building under the tree in a closed space in an open space ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering When a canal is carried over a natural drainage, the structure provided, is known as Aqueduct Syphon-aqueduct Super passage Syphon Aqueduct Syphon-aqueduct Super passage Syphon ANSWER DOWNLOAD EXAMIANS APP