Building Construction

Building Construction
The maximum total settlement for isolated foundations on clayey soils should be limited to

25 mm
40 mm
65 mm
100 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The angle between skew back of a flat arch and the horizontal, is kept approximately equal to

0°
30°
60°
90°

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
A pre-stressed concrete pile is

Extremely durable
Lighter in weight
All of these
Easy to handle

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
Brick nogging type of partition wall, is constructed by

Laying bricks as headers in cement mortar
Constructing brick work within a wooden framework
Reinforcing brick wall with iron straps
Laying bricks as stretchers in cement mortar

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The type of footing which is used to transmit heavy loads through steel columns is

Grillage foundation
Well foundation
Raft foundation
Isolated footing

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form work from the underside of slabs, can be removed only after

7 days
4 days
1 day
14 days

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑