Building Construction The maximum total settlement for isolated foundations on clayey soils should be limited to 65 mm 100 mm 40 mm 25 mm 65 mm 100 mm 40 mm 25 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The disease of dry rot in timber is caused by None of these Complete submergence in water Lack of ventilation Alternate wet and dry conditions None of these Complete submergence in water Lack of ventilation Alternate wet and dry conditions ANSWER DOWNLOAD EXAMIANS APP
Building Construction In English garden wall bond One course of headers to three or five course of stretchers The middle course of stretchers is started with a header to give proper vertical joints All of these Queen closer in provided in each heading course One course of headers to three or five course of stretchers The middle course of stretchers is started with a header to give proper vertical joints All of these Queen closer in provided in each heading course ANSWER DOWNLOAD EXAMIANS APP
Building Construction Expansion joints in masonry walls are provided if length exceeds 20 m 10 m 30 m 40 m 20 m 10 m 30 m 40 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stepped structure provided for lateral support of a structure, is Buttress Parapet wall Breast wall Retaining wall Buttress Parapet wall Breast wall Retaining wall ANSWER DOWNLOAD EXAMIANS APP
Building Construction Pile foundation is generally provided if soil is All listed here Made up Compressible Water logged All listed here Made up Compressible Water logged ANSWER DOWNLOAD EXAMIANS APP