Airport Engineering The length of clear zone for none instrument runway of a small aircraft is 150 m 300 m 750 m 600 m 150 m 300 m 750 m 600 m ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering An airport has 4 gates. If the weighted average gate occupancy time is 30 minutes and gate utilization factor is 0.5, then the capacity of the gate will be 2 aircrafts per hour 1 aircraft per hour 16 aircrafts per hour 4 aircrafts per hour 2 aircrafts per hour 1 aircraft per hour 16 aircrafts per hour 4 aircrafts per hour ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering In Instrumental landing system, the middle markers are located About 7 km. ahead of the runway threshold At the runway threshold About 1 km. ahead of the runway threshold Along the extended centre line of runway end About 7 km. ahead of the runway threshold At the runway threshold About 1 km. ahead of the runway threshold Along the extended centre line of runway end ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering The coordinates of the ends of a runway are (5000, 5000) and (8000, 7000). The co-ordinates of another runway are (4600, 5100) and (7000, 5300). The co-ordinates of the A.R.P. are (61500, 5600) (5800, 5200) (6500, 6000) (8000, 7000) (61500, 5600) (5800, 5200) (6500, 6000) (8000, 7000) ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering Effective length of a runway is the distance between Point of intersection of the glide path and the extended plane of the runway surface and the other end of the runway Ends of the runway Ends of the clear way on either side Point of intersection of the obstruction clearance line and the extended plane of the runway surface, and the other end of the runway Point of intersection of the glide path and the extended plane of the runway surface and the other end of the runway Ends of the runway Ends of the clear way on either side Point of intersection of the obstruction clearance line and the extended plane of the runway surface, and the other end of the runway ANSWER DOWNLOAD EXAMIANS APP
Airport Engineering For the proposed air port, the survey project provides Grading plan Topographic plan Master plan All listed here Grading plan Topographic plan Master plan All listed here ANSWER DOWNLOAD EXAMIANS APP