Building Construction The inner section of a cavity wall, is generally known as Pillar Leaf wall Buttress Pilaster Pillar Leaf wall Buttress Pilaster ANSWER DOWNLOAD EXAMIANS APP
Building Construction For the construction of flyovers in sandy soils, the type of foundation provided, is Raft footing Strap footing Pier footing Combined footing Raft footing Strap footing Pier footing Combined footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 5 to 10 cm 25 to 30 cm 15 to 20 cm 30 to 45 cm 5 to 10 cm 25 to 30 cm 15 to 20 cm 30 to 45 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 2 1 : 4 1 : 3 1 : 1 1 : 2 1 : 4 1 : 3 1 : 1 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundation in which a cantilever beam is provided to join two footings, is known as Combined footing Raft footing Strip footing Strap footing Combined footing Raft footing Strip footing Strap footing ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of making the back ground rough, before plastering, is Blistering Dubbing Hacking Peeling Blistering Dubbing Hacking Peeling ANSWER DOWNLOAD EXAMIANS APP