Building Construction The floor is rubbed with oxalic acid, for making its surface Durable Free from voids Glossy Uniform Durable Free from voids Glossy Uniform ANSWER DOWNLOAD EXAMIANS APP
Building Construction The rock formed from the solidification of molten matter (magma) is called: Igneous rock Sedimentary rock None of these Metamorphic rock Igneous rock Sedimentary rock None of these Metamorphic rock ANSWER DOWNLOAD EXAMIANS APP
Building Construction Suitable spacing of timber piles, is 100 cm 80 cm 90 cm 70 cm 100 cm 80 cm 90 cm 70 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of Raymond pile Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m All listed here Diameter of pile at bottom varies from 20 cm to 28 cm Diameter of top of piles varies from 40 cm to 60 cm Lengths vary from 6 m to 12 m All listed here Diameter of pile at bottom varies from 20 cm to 28 cm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 60° 0° 90° 30° 60° 0° 90° 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The number of steps in a flight generally should not be less than No limit 5 2 3 No limit 5 2 3 ANSWER DOWNLOAD EXAMIANS APP