Building Construction The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed 10 m 15 m 5 m 20 m 10 m 15 m 5 m 20 m ANSWER DOWNLOAD EXAMIANS APP
Building Construction The floor is rubbed with oxalic acid, for making its surface Uniform Free from voids Durable Glossy Uniform Free from voids Durable Glossy ANSWER DOWNLOAD EXAMIANS APP
Building Construction In case of foundations on black cotton soils, the most suitable method to increase the bearing capacity of soils is to Compact the soil Increase the depth of foundation Replace the poor soil Drain the soil Compact the soil Increase the depth of foundation Replace the poor soil Drain the soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum bearing capacity of soil is that of Dry coarse sandy soil Hard rocks Black cotton soil Loose fine sandy soil Dry coarse sandy soil Hard rocks Black cotton soil Loose fine sandy soil ANSWER DOWNLOAD EXAMIANS APP
Building Construction Minimum width of landing should be One fourth the width of stairs Half the width of stairs Twice the width of stairs Equal to width of stairs One fourth the width of stairs Half the width of stairs Twice the width of stairs Equal to width of stairs ANSWER DOWNLOAD EXAMIANS APP
Building Construction The raft slab is projected beyond the outer walls of the structure by 25 to 30 cm 30 to 45 cm 5 to 10 cm 15 to 20 cm 25 to 30 cm 30 to 45 cm 5 to 10 cm 15 to 20 cm ANSWER DOWNLOAD EXAMIANS APP