Power Systems The essential requirement(s) for power plants to be operated as peak load plants are Quick response to load variation. All of these Capability of quick starts. Low capital cost. Quick response to load variation. All of these Capability of quick starts. Low capital cost. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Under excited Synchronous phase modifier works as any of the above shunt capacitor shunt reactor series capacitor any of the above shunt capacitor shunt reactor series capacitor ANSWER DOWNLOAD EXAMIANS APP
Power Systems Three generators rated 100 MVA, 11 kV have an impedance of 0.15 pu each. If in the same plant, these generators are being replaced by a single equivalent generator, the effective impedance of equivalent generator will be 0.15 pu 0.45 pu 0.05 pu 0.25 pu 0.15 pu 0.45 pu 0.05 pu 0.25 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems The value of diversity factor is 1 greater than 1 less than 1 0 1 greater than 1 less than 1 0 ANSWER DOWNLOAD EXAMIANS APP
Power Systems An over current relay, having a current setting of 125% connected to a supply circuit through a current transformer of ratio 500/5. The plug setting multiplier for a fault current of 5 kA is 2 6 8 5 2 6 8 5 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of strands of ACSR conductor for 3 layer transmission line? 1 19 29 7 1 19 29 7 ANSWER DOWNLOAD EXAMIANS APP