Waste Water Engineering The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is 204 cu.m 208 cu.m 212 cu.m 216 cu.m 204 cu.m 208 cu.m 212 cu.m 216 cu.m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the depletion of oxygen is found to be 5 ppm after incubating a 2.5% solution of sewage sample for 5 days at 21°C, B.O.D. of the sewage is 200 ppm 100 ppm 50 ppm 150 ppm 200 ppm 100 ppm 50 ppm 150 ppm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Nitrates are formed Ammonia is formed Carbondioxide is formed Nitrites are formed Nitrates are formed Ammonia is formed Carbondioxide is formed Nitrites are formed ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Kjeldahl nitrogen is a mixture of Ammonia and nitrogen Organic nitrogen and ammonia Nitrogen and organic nitrogen All listed here Ammonia and nitrogen Organic nitrogen and ammonia Nitrogen and organic nitrogen All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage is pumped up From low lying areas All listed here From basements From flat areas From low lying areas All listed here From basements From flat areas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A manhole is generally provided at each Bend Change of gradient Junction All of these Bend Change of gradient Junction All of these ANSWER DOWNLOAD EXAMIANS APP