Industrial Engineering and Production Management The deductions for, employees provident fund start After 100 days of joining the service After 240 days of joining the service Immediately on joining the service After 60 days of joining the service After 100 days of joining the service After 240 days of joining the service Immediately on joining the service After 60 days of joining the service ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In time study, the rating factor is applied to determine Fixation of incentive rate Standard time of a job Merit rating of the worker Normal time of a worker Fixation of incentive rate Standard time of a job Merit rating of the worker Normal time of a worker ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In manufacturing management, the term 'Dispatching' is used to describe Dispatch of finished product of the user Dispatch of factory mail Dispatch of work orders through shop floor Dispatch of sales order Dispatch of finished product of the user Dispatch of factory mail Dispatch of work orders through shop floor Dispatch of sales order ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In perpetual inventory control, the material is checked as it reaches its Minimum value Maximum value Middle value Average value Minimum value Maximum value Middle value Average value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include All of the listed here Guaranteed basic pay Ease of administration Adequate incentive All of the listed here Guaranteed basic pay Ease of administration Adequate incentive ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following statement is correct about the network diagram? The head of the arrow represents the end of an activity. All of the these The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The tail end of the arrow represents the start of an activity. The head of the arrow represents the end of an activity. All of the these The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The tail end of the arrow represents the start of an activity. ANSWER DOWNLOAD EXAMIANS APP