GETCO Exam Paper (22-07-2015) Steady state stability of a power system is improved by by fast switching decreasing generator inertia using double circuit line instead of single circuit line reducing fault clearing time by fast switching decreasing generator inertia using double circuit line instead of single circuit line reducing fault clearing time ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) The national song of India was composed by Bankim Chandra Chatterji Iqbal Jai Shankar Prasad Rabindranath Tagore Bankim Chandra Chatterji Iqbal Jai Shankar Prasad Rabindranath Tagore ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Critical clearing time of a fault in a power system is related to Steady state limit Short circuit limit Reactive power limit Transient stability limit Steady state limit Short circuit limit Reactive power limit Transient stability limit ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) In the standard B-H curve X axis and Y axis intercepts respctively represents Flux and MMF coercive force and residual magnetism Hysteresis loss and Flux residual magnetism and coercive force Flux and MMF coercive force and residual magnetism Hysteresis loss and Flux residual magnetism and coercive force ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Select the wrong statement from the following in relation to power flow analysis jacobian is always required Y Bus is required for power flow analysis Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system jacobian is always required Y Bus is required for power flow analysis Approximation is used in FDLF method No of ittretion in N R method can not be more than 30 for any system ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (22-07-2015) Light from the nearest star (other than the sun) reaches the earth in 42 secs 4.2 hours 4.2 years 4.2 minutes 42 secs 4.2 hours 4.2 years 4.2 minutes ANSWER DOWNLOAD EXAMIANS APP