Building Construction Stability of an existing structure may be disturbed by Rising of water table All listed here Vibrations caused by traffic movements Mining in the neighborhood Rising of water table All listed here Vibrations caused by traffic movements Mining in the neighborhood ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: Grillage foundation None of these Raft foundation Pile formation Grillage foundation None of these Raft foundation Pile formation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The depth of the ground water table may be ascertained by None of these Standing on the well in the vicinity Looking through the well in the vicinity Measuring the depth of water in the well None of these Standing on the well in the vicinity Looking through the well in the vicinity Measuring the depth of water in the well ANSWER DOWNLOAD EXAMIANS APP
Building Construction The line of intersection of the surfaces of a sloping roof forming an external angle exceeding 180°, is Valley None of these Hip Ridge Valley None of these Hip Ridge ANSWER DOWNLOAD EXAMIANS APP
Building Construction If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is 25 18 24 12 25 18 24 12 ANSWER DOWNLOAD EXAMIANS APP
Building Construction An ordinary concrete may be made water proof by adding Impermo All of these Pudlo Snowcem Impermo All of these Pudlo Snowcem ANSWER DOWNLOAD EXAMIANS APP