Building Construction Stability of an existing structure may be disturbed by Rising of water table Vibrations caused by traffic movements Mining in the neighborhood All listed here Rising of water table Vibrations caused by traffic movements Mining in the neighborhood All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical posts placed at the top and bottom ends of a flight supporting the hand rail are known as Balustrades Newel posts Balusters Railings Balustrades Newel posts Balusters Railings ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum permissible differential settlement, in case of foundations in clayey soil, is usually limited to 30 mm 40 mm 10 mm 20 mm 30 mm 40 mm 10 mm 20 mm ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 7 days 14 days 4 days 1 day 7 days 14 days 4 days 1 day ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 0° 90° 30° 60° 0° 90° 30° 60° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is 25 cm 20 cm 15 cm 10 cm 25 cm 20 cm 15 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP