Irrigation Engineering Side slopes generally kept for canals in loam soil, are: Both (A) and (B) 1 : 1 in cutting and 1½ : 1 in filling Neither (A) nor (B) 1½ : 1 in cutting and 2 : 1 in filling Both (A) and (B) 1 : 1 in cutting and 1½ : 1 in filling Neither (A) nor (B) 1½ : 1 in cutting and 2 : 1 in filling ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The normal annual precipitation at stations X, A, B and C are 700 mm, 1000 mm, 900 mm and 800 mm respectively. If the storm precipitation at three station A, B and C were 100 mm, 90 mm and 80 mm respectively, then the storm precipitation for station X will be 105 mm 80mm 90 mm 70mm 105 mm 80mm 90 mm 70mm ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is PL/1000C 100 PLC PC/100L PLC/1000 PL/1000C 100 PLC PC/100L PLC/1000 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Which one of the following statements is correct? The canal system runs on ridges, gets divided into smaller channels and spreads its water on the land All listed here The drainage system runs along the lowest line, collects drainage water from the slopes and joins the main stream The canal system and the drainage system are complementary The canal system runs on ridges, gets divided into smaller channels and spreads its water on the land All listed here The drainage system runs along the lowest line, collects drainage water from the slopes and joins the main stream The canal system and the drainage system are complementary ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering To control the silt entry into a distributary at head regulator, King's vanes are provided which are the walls Of height ⅓rd to ¼th the depth of water in the main canal Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick All listed here Of height ⅓rd to ¼th the depth of water in the main canal Spaced at interval of 1½ times their heights Of R.C.C. or steel plate 8 cm thick All listed here ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The most suitable location of a canal head work, is Rock stage of the river Trough stage of the river Boulders stage of the river Delta stage of the river Rock stage of the river Trough stage of the river Boulders stage of the river Delta stage of the river ANSWER DOWNLOAD EXAMIANS APP