Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on Right side Left side All listed here Both sides Right side Left side All listed here Both sides ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering For supplying water to rabi crop, kharif crop and sugarcane, the channel is designed for a capacity equal to the greater of the water requirement of rabi and sugarcane or kharif and sugarcane rabi or kharif or sugarcane rabi or kharif rabi and kharif or sugarcane rabi and sugarcane or kharif and sugarcane rabi or kharif or sugarcane rabi or kharif rabi and kharif or sugarcane ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The runoff increases with increase in infiltration capacity All of these increase in permeability of soil increase in intensity of rain increase in infiltration capacity All of these increase in permeability of soil increase in intensity of rain ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The depth of the crest of a scouring sluice below the crest of a head regulator, is generally kept 0.20 m 3.20 m 1.20 m 2.20 m 0.20 m 3.20 m 1.20 m 2.20 m ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering A hydraulic jump is generally formed when a stream moving with A sub-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a critical velocity A hyper-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a sub-critical velocity A sub-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a critical velocity A hyper-critical velocity meets a stream moving with a hyper-critical velocity A hyper-critical velocity meets a stream moving with a sub-critical velocity ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In gravity canals, F.S.L. is Always below the ground level Generally 4 to 5 metres above the ground level Always at the ground level Only a few cm above the ground level Always below the ground level Generally 4 to 5 metres above the ground level Always at the ground level Only a few cm above the ground level ANSWER DOWNLOAD EXAMIANS APP