Waste Water Engineering Setting out the alignments of sewers may start from Any point City Out-fall Tail end Any point City Out-fall Tail end ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks All listed here Floating materials are removed by screening ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For non-scouring velocity 5 m/sec, the type of sewers generally preferred to, is Cast iron sewers Stone ware sewers Cement concrete sewers Glazed bricks sewers Cast iron sewers Stone ware sewers Cement concrete sewers Glazed bricks sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of design discharge to the surface area of a sedimentation tank is called Surface loading Overflow rate Overflow velocity All of these Surface loading Overflow rate Overflow velocity All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 300 m 150 m 200 m 100 m 300 m 150 m 200 m 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 100 m 300 m 50 m 200 m 100 m 300 m 50 m 200 m ANSWER DOWNLOAD EXAMIANS APP