GETCO Exam Paper (11-06-2017) SCADA is all data monitoring and control real time data acquisition and processing data storing all data monitoring and control real time data acquisition and processing data storing ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Current rating is not necessary in case of circuit breakers isolators circuit breakers and load break switches load break switches circuit breakers isolators circuit breakers and load break switches load break switches ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) Burden of a protective relay is the power absorbed by the circuit of relay developed by the relay circuit required to operate the circuit breaker none absorbed by the circuit of relay developed by the relay circuit required to operate the circuit breaker none ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) In a load duration curve for an integrated power system, the uppermost crest represents the energy contributed by which one of the following? Base power stations Major thermal stations Non-conventional power stations Peaking hydro or gas turbine stations Base power stations Major thermal stations Non-conventional power stations Peaking hydro or gas turbine stations ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) The Mid Day meal scheme was launched on August 15, 1992 August 15, 2001 August 15, 1995 August 15, 2000 August 15, 1992 August 15, 2001 August 15, 1995 August 15, 2000 ANSWER DOWNLOAD EXAMIANS APP
GETCO Exam Paper (11-06-2017) For a lossy transmission line, the characteristic impedance does not depend on the conductivity of the conductors length of the line the operating frequncy of the line conductivity of the dielectric separating the conductors the conductivity of the conductors length of the line the operating frequncy of the line conductivity of the dielectric separating the conductors ANSWER DOWNLOAD EXAMIANS APP