GETCO Exam Paper (11-06-2017)

GETCO Exam Paper (11-06-2017)
In thermal power plants, the pressure in the working fluid cycle is developed by

condenser
turbine
superheater
feed water pump

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (11-06-2017)
Load shedding is done for

efficient operation of equipment
power factor improvement
reducing peak demand on the system
repairing of machines

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (11-06-2017)
What time _____

the train leaves?
does the train leave?
is the train leaving?
leaves the train?

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (11-06-2017)
By increasing the transmission voltage to double of its original value the same power can be dispatched

one fourth of original value
equal to original value
half the original value
double the original value

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (11-06-2017)
Sorry, she can't come to the phone. She _____a bath

having
have
has
is having

ANSWER DOWNLOAD EXAMIANS APP

GETCO Exam Paper (11-06-2017)
Arc in a circuit breaker is interrupted at

maximum current
minimum voltage
zero current
maximum voltage

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON GETCO Exam Paper (11-06-2017)

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑